Blueprint → Bid
Turn construction drawings into confident bids.
Production Grade is a digital takeoff and estimating workspace. Upload PDF, image, DXF, or DWG drawings, calibrate the scale, measure walls, columns, and areas — then generate a BOQ, apply material rates, and export estimates to PDF or Excel.
Built for contractors & estimators · INR rate master · Sample Gujarat demo project
Wall area 842 m²
RCC volume 48.2 m³
Sample quantities
The problem
Your takeoff shouldn't live in three tools.
Ruler, PDF viewer, spreadsheet — every hand-off between them is a chance for a measurement to drift or a number to be retyped wrong.
Before — the manual way
- Scale rulers and squinting at printed PDFs
- Every quantity retyped into a spreadsheet
- Formula typos that surface after the bid goes out
- No link between the drawing and the estimate
After — one connected canvas
- Measure on a scale-calibrated canvas — lengths, areas, counts
- Walls and columns grouped by thickness and size
- Quantities flow straight into the BOQ
- One pipeline from drawing to exported estimate
How it works
Four steps from drawing to bid.
01
Upload your drawing
PDF, image, DXF, or DWG — DWG files convert automatically in a background job.
projects / warehouse-a / uploadDrop a drawing to start the takeoff
PDFPNG / JPGDXFDWGground-floor-plan.dwg → converting…72%02
Calibrate scale & measure
Set the scale against a known dimension, then measure walls, columns, and areas directly on the canvas.
takeoff canvas · scale 1:100Calibrated against a known 14.00 m dimension · walls, columns & areas measurable
03
Confirm OCR suggestions
OCR reads text on the drawing and suggests element labels. You stay in control — confirm or dismiss each one.
OCR label suggestions- W1 · 230 mm brick wallConfirmed
- C1 · 300 × 300 columnConfirmDismiss
- RCC SLAB 150 THKConfirmDismiss
Suggestions come from drawing text — nothing is applied until you confirm it.
04
BOQ, estimate, export
Generate a bill of quantities, apply material rates and usage norms, and export the estimate to PDF or Excel.
BOQ · sample estimateItem Qty Amount Brickwork 230 mm 842 m² ₹24,80,000 RCC columns M25 14.6 m³ ₹14,10,000 Slab concrete M25 33.6 m³ ₹6,80,000 Total ₹45,70,000 Export PDFExport Excel
Features
Everything between the drawing and the bid.
Drawing takeoff
Calibrated lengths, areas, and counts measured directly on your PDF, image, DXF, or DWG files.
Element grouping
Walls grouped by thickness, columns by size — with per-element detail and volumes.
Material costing
A rate master plus material usage norms turn measured quantities into itemised costs.
BOQ & exports
An editable bill of quantities with manual line items, exported to PDF or Excel for clients.
Early access
Built with estimating teams in mind.
Production Grade is in early access. Explore the product with the built-in demo project — sample data from Gujarat, India, priced with an INR rate master.
See it with real drawings
Sample project: Vapi, Gujarat · walls, columns, BOQ & estimate included
Get started
Run your next takeoff in Production Grade.
Free to start. A sample demo project is included so you can explore before uploading your own drawings.